Campus Layout & Details
AUTOMOTIVE TECHNOLOGY TRAINING
- 43,000 square foot Auto Lab
- 56 – Bays
- 15 – 10,000 lb Lifts
- 3 – 15,000 lb Lifts (Heavy Duty Lifts)
- 5 – Alignment Racks
- 3 – Classrooms that contain 10,000 lb Lifts
- 1 – Classroom with one Hunter Hawkeye Alignment Rack
- 3 – Dynos:
- In Lab – Mustang Dyno,
- In Classroom – SuperFlow Engine Dyno
- SuperFlow Axiline Transmission Dyno
COLLISION REPAIR TRAINING PROGRAM
- 27,000 square foot Collision Lab
- 2 – Paint Booths
- Paint mixing area
- Training with Waterborne Paint
- Custom Airbrushing
- I-CAR Enhanced Program
- 2 – Computerized Chief Frame Racks
TRUCK & DIESEL TECHNOLOGY PROGRAM
- 11,000 square foot Diesel Lab
- 9 – Bays
- 15 – Dedicated Welding Booths
- 2 – Dynos: In Classroom
- Taylor Engine Dyno
- SuperFlow Axiline Transmission Dyno
AIR CONDITIONING, REFRIGERATION AND HEATING TECHNOLOGY PROGRAM (HVAC)
- 7 – Dedicated classrooms
- Training on Hampden Trainers
- Energy Audit Training House
- 8,200 square foot Welding Lab:
- 90 – Dedicated Welding Booths
- Welding, cutting, and grinding rooms
- Lincoln Electric and Miller welding equipment